Installing Building Services

Installing services is managed through four goals: time, cost, quality and safety. A Gantt chart shows tasks as bars, and the critical path is the longest chain that decides the finish date. A cost estimate = sum of (quantity x unit rate), plus overheads, profit and a small contingency.

🎬 Step-by-step story

  1. A services job is split into tasks: pipes, ducts, cables and a final test. Each task will get one bar.
  2. Each bar has a start and an end. Pipes start first, ducts and cables start before the earlier task ends.
  3. The test comes last. It can start only when all the other work is done. The red line shows that gate.
  4. The pipes are 2 weeks late. Watch every later bar slide to the right, and the finish week move.
  5. Now the money. Cost = quantity x rate. The blue block is material, the yellow is labour, the purple is overheads.
  6. Free play: change the pipe length and the delay. See the cost and the finish week change.

Tip: drag the 3D scene to turn it. Use two fingers to zoom.

🤔 Common doubts, cleared

Why not start all tasks on day 1?

Some tasks need others first, and too many teams in one place get in each other's way. The schedule orders them.

Why can ducts start before pipes finish?

They are in different places, so they can overlap. Overlap makes the job shorter.

Why does the test wait for everything?

You can only test the whole system when all parts are in place. The red line shows this gate.

Why does a delay in pipes move the test too?

The test depends on the later tasks, which depend on pipes. A late start passes along the chain.

Why add overheads to the estimate?

The company also pays for supervision, site office and tools. If we leave them out, the job makes a loss.

Construction management of services work

Installing building services is a team job. The site manager watches four goals together: Quality (work as designed), Cost, time (delivery date) and Safety.

The main tools are:

Making the schedule

Steps to schedule a job: (1) list the tasks, (2) estimate how long each takes, (3) decide which task must come before which, (4) draw bars, (5) find the longest chain. In the 3D, pipes (3 weeks), ducts and cables overlap, and the test (2 weeks) starts only after they finish. If the pipes are delayed, every following bar moves by the same amount.

Cost estimation of services work

An estimate is a careful guess of the cost before the work starts.

  1. Read the drawings and list every item (pipes, valves, fittings, ducts, cables).
  2. Quantity take-off: measure or count each item (metres, pieces).
  3. Multiply by the unit rate (price per metre or per piece, material + labour).
  4. Add the direct costs (material, labour, machines).
  5. Add overheads (site office, supervision, head office share) and profit.
  6. Add a small contingency for surprises.

Formula: Estimate = Σ(quantity x unit rate) + overheads + profit + contingency.

Keeping time and cost under control

During the job, compare progress with the plan every week. If a task on the critical path slips, add workers or work in shifts. Keep stores of material small but enough, so that work does not stop. Record every change, because extra work must be priced and agreed in writing.

Key formulas and definitions

Worked examples

1. 40 m of pipe: material 12 and labour 8 per metre. Overheads 15%. Find the estimate.

Direct = 40 x (12 + 8) = 800. Overheads = 0.15 x 800 = 120. Estimate = 920.

2. Pipes 3 weeks (start week 0), ducts 3 weeks (start week 2), cables 3 weeks (start week 4), test 2 weeks after all work. Find the finish week.

Pipes end at 3, ducts at 5, cables at 7. The test starts at week 7 and ends at week 9.

3. In the last problem, the pipes are 2 weeks late and everything after moves. What is the new finish?

Every task moves by 2 weeks, so the finish is week 9 + 2 = week 11.

4. Direct cost 5000, overheads 12%, contingency 5% on the subtotal. Find the final estimate.

5000 x 1.12 = 5600. 5600 x 1.05 = 5880.

Common mistakes

Practice quiz

1. A chart that shows tasks as bars over time is a:
2. Cost of 25 m pipe at 18 per m:
3. The critical path is:
4. Which is an overhead?
5. The test of a system is done:

Practice: answer these yourself

Type or choose your answer, then press Check. Use a hint if you are stuck; the full solution appears after you answer.

Frequently asked questions

What is the critical path in simple words?

It is the longest chain of tasks that must follow each other. It sets the earliest finish date.

What is the difference between direct cost and overhead?

Direct cost goes into the work itself (material, labour, machines). Overhead is the cost of running the business and the site.

How accurate is an estimate?

It is a careful guess. Good take-off, current unit rates and a small contingency make it close to the real cost.